博文

目前显示的是标签为“Water Well Drilling Rigs Supplier”的博文

What are the reasons for rig track delinking and how to deal with it?

图片
For rig operators, track disconnection is a common problem. For rigs, occasional off-chain is unavoidable, because the working environment is relatively harsh, and crawling into the soil or stones will cause off-chain. If the rig is often off-chain, then it is necessary to find the cause, because the off-chain of the rig can easily lead to accidents. What are the reasons for the rig off-chain? Today,  water well drilling rigs supplier  will briefly talk about the common reasons for off-chain. In fact, there are many reasons for the rig to be off-chain. In addition to impurities such as track entering the soil or stones will cause the rig to be off-chain, there are also faults in the walking ring gear, de-sprockets, and chain protectors that will cause off-chain. In addition, improper operation will cause the rig to be off-chain. 1. Tension cylinder failure caused chain disconnection. At this time, you should check whether the tensioning cylinder has forgotten to butte...

Well drilling rig industry is developing towards automation

图片
Well drilling rig industry is developing towards automation Water Well Drilling Rigs Supplier  shares that with the continuous development of science and technology, machinery and equipment are developing towards the direction of automation, water drilling rig is one of them. In the water well drilling rig industry, the degree of automation and remote control technology of water well drilling rig is getting faster and faster, which is also the general trend of future development. The benefits brought by the automatic production of water well drilling rig are that it improves the production efficiency of water well drilling rig, effectively reduces the production cost, virtually improves the production quality, and reduces the human operation error. It is very necessary and important to comprehensively look at the development of the automatic production of water well drilling rig. The automatic production of  water well drilling rig  is composed of downhole automati...

Our rigs are shipped to Pakistan

图片
We are a  Water Well Drilling Rigs Supplier , in recent days, two sets of JK590C+Sullair600 begin to service SEVEN STAR in Pakistan, wish our machine can service clients well!

JK590C is working on quarry

As a  Water Well Drilling Rigs Supplier . Today we would like to share you our machine JK590 crawler mounted hydraulic DTH drilling rig.  JK590C / JK590 are the new generation of internal combustion (electric) crawler mounted hydraulic DTH drilling rig, the latest updated version of JK590 series. In contrast with the last generation, they feature lower operation cost and humanized design. They adopt a 70kW Yuchai diesel engine and hydraulic oil pump station assembly to generate power, allowing rigs to rotation, propelling, lifting, walking and angle positioning.

Use and maintenance of water well drilling rig during run-in period

图片
Use and maintenance of water well drilling rig during run-in period, shared by  Water Well Drilling Rigs Supplier . 1. As construction machinery is a special vehicle, operators should receive training and guidance from the manufacturer, have a full understanding of the structure and performance of the machine, and obtain certain experience in operation and maintenance before operating the machine. The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, the operator must read the operation and maintenance manual first and carry out operation and maintenance according to the requirements of the manual. 2. Pay attention to the working load in the running-in period. Generally, the working load in the running-in period should not exceed 80% of the rated working load, and the appropriate workload should be arranged to prevent the occurrence of overheating caused by...

What is the maintenance of the track of water drilling rig?

图片
As a  Water Well Drilling Rigs Supplier , today we would like to share the maintenance of the  crawler  of water drilling rig for you. 1. Introduction of  crawler  of water well drilling rig The crawler of water well drilling rig is composed of crawler plate and crawler pin. The  crawler  pin connects each  crawler  board to form the track link. There are holes at both ends of the crawler plate, which meshes with the driving wheel, and induction teeth in the middle, which are used to normalize the crawler plate and prevent the crawler from falling off when steering by the well drilling machine. On the side in contact with the ground, there are reinforced anti-skid bars (referred to as patterns), so as to improve the solidity of the crawler plate and the adhesion between the crawler and the ground. Water drilling rig site also support sprocket, support heavy wheel, drive wheel and rail chain, etc.. 2. Clean  water well drilling rig...

[Water Well Drilling Rigs Supplier]Does engineering rig also have run-in period?

图片
Does engineering rig also have run-in period? Water Well Drilling Rigs Supplier  shares that after the construction machinery leaves the factory, it is generally stipulated that there is a run-in period of about 60 hours (sometimes called run-in period), which is stipulated by the manufacturing factory according to the technical characteristics of the initial use of construction machinery. However, at present, some users ignore the special technical requirements of the new machine run-in period due to the lack of common sense of using construction machinery, or because of the tight schedule, or because they want to get profits as soon as possible. The machine is overworked for a long time during the run-in period, which leads to frequent early failure of the machine, which not only affects the normal use of the machine and shortens the service life of the machine, but also affects the progress of the project due to the damage of the machine. Therefore, the use and maintenance of...

Our JK650 drill rig machine is woring

We are the  Water Well Drilling Rigs Supplier . JK650 is an all-in-one DTH drill rig in which Atlas Copco air compressor machine head is built in. It is very welcomed since comes into the market because the more automation, higher working efficiency, better reliability and simpler operation. JK650 is the integration of drilling rig and air compressor, which has many advantages like facilitating air compressor transport and management on mining site, retaining more air energy and requiring less manpower.

JKZ1000 pile foundation drilling machine reloaded!

图片
JKZ1000 pile-base drilling machine is a new type supplied by  Water Well Drilling Rigs Supplier , it is high-efficiency, multi-function hydraulic drilling machine, equipped with high-power diesel engine, heavy hydraulic motor, suitable for large-aperture pile-base operation, is the replacement of rotary drilling into the new weapon! Power plant:  The power system adopts 160KW engine to drive large displacement plunger pump with strong power and stable performance. Air filter is composed of air pre-filter, air fine filter and three-stage filter, which can effectively protect the normal operation of the engine in bad conditions. Back to the corner:  Four rotary hydraulic motors are installed in the rotary machine to drive the rotary gearbox. Through gear reduction, the rotary spindle reaches the rotation speed suitable for rotary drilling, and the output torque is greatly increased to complete the rotary feed and connecting and unloading rod. The turning machine ...

[Water Well Drilling Rigs for sale]Drilling process and drilling development status

图片
Drilling process and drilling development status Drilling process: Water Well Drilling Rigs Supplier  shares that drilling is a system engineering, is a multi-professional, multi-work using a variety of equipment, tools, materials for joint operations. At the same time it is multi - procedures closely linked, multi - link continuous operation. The whole process of construction is quite complex. Each well is completed in three stages: pre-drilling, drilling and completion. Every single project Stage and a series of construction procedures. The main procedures generally include: well location, road survey, foundation construction, derrick installation, moving, equipment installation, primary spud, secondary spud, drilling, starting, bit change, drilling, well completion, electrical measurement, casing running, cementing and so on. Current situation of the development: In recent years, the global drilling workload continues to increase, with more than 110,000 Wells dr...

[Water Well Drilling Rigs for sale]Classification of the drill bit

图片
Classification of the drill bit Cable drill Cable drill, also known as a percussion drill.  Water Well Drilling Rigs Supplier  shares that the cable drill bit is sent to the bottom of the well with the wire rope, and the beam mechanism is driven by the power to make one end of the beam move up and down, and drive the wire rope and the bit to produce up and down impact, so that the rock is broken. Due to slow drilling speed and low efficiency, the rotary drilling has been gradually replaced by the rotary drilling. However, it has the advantages of simple equipment, low cost, no oil pollution, etc., and can be used in some shallow low-pressure oil and gas Wells, leakage Wells, etc. Rotating drill To break rocks by cutting or grinding as the bit rotates. Is currently the most common drilling method. Faster than ton drilling, and easy to handle well collapse, blowout and other complex situations. Way according to the power of the rotary drill and can be divided into two...

Water Well Drill Rig and drilling technology

图片
Water Well Drill Rig and drilling technology Water Well Drilling Rigs Supplier  shared that drilling is the use of mechanical equipment to drill a certain amount of attempted holes through the formation. It can be divided into cable drilling technology and rotary drilling technology according to rock breaking mode and drilling tool type. In geological exploration and geological engineering, it is beneficial for drilling equipment to drill underground. For cylindrical holes with smaller diameter and larger depth, they are called boreholes. Different drill straight and drill depth are designed according to drilling purpose. For example, drilling for oil, gas, and ground water has larger bore sizes. General boreholes used for geophysical logging such as coring are small. The main functions of drilling are: 1. Obtain underground physical data, and obtain core, cuttings, oil, water and natural gas from the bottom of the well. 2. As a geophysical logging channel, it can obtain...

How Should The Water Well Rig Be Used During The Running-in Period?

图片
We understand that any machine has a running-in period, so the water well drilling rig is no exception. In the running-in period of the water drilling rig, we must pay attention to the maintenance and maintenance of it. Only when the running-in period is used can we reduce the occurrence of the rig failure. Better protection for future use. 1. The operator should receive training and guidance from the  Water Well Drilling Rigs Supplier , have a thorough understanding of the structure and performance of the rig, and obtain certain operation and maintenance experience before operating the machine. The product maintenance and repair instructions provided by the manufacturer are the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the maintenance instructions and operate and maintain according to the requirements of the manual. 2. Pay attention to the working load during the running-in period. The  Water Well Drill...