Maintenance Knowledge of Small Dth Drilling Rig
I. Installation of DTH drill rig : 1. The size of the rock drilling space preparation space can be determined according to the type and method of drilling. 2. Bring gas water near the point of use (if water and dust removal is needed), pipes, lighting circuits, etc. 3. Hole position According to the design requirements, we guarantee the stable positioning of the rig. Second, check before operation: 1. When starting work, please carefully check whether the gas and water (if water and dust removal) pipes are tightly connected, especially if the Fengshui pipe joint and the Fengshui pipe are tightly connected to prevent tripping. You should check for injuries and not allow all joints to leak . 2. Make sure the oil mist is full of organic oil (not too much). 3. Check whether the screws, nuts, joints, etc. of each part of the small-scale down-hole drilling rig for photovoltaic piles are tightened, and that the positions are firm and firm. 3. Drilling work procedures and...