Maintenance And Maintenance of Water Well Drilling Rig Crawler
One. Crawler introduction The water well drilling rigs track is composed of track shoes and track pins. The track pins connect the track shoes to form a tracking link. There are holes at both ends of the track shoe, which are engaged with the driving wheel, and there are induced teeth in the middle to regulate the track, and the water well drilling rig prevents the track from falling off during steering. Improve the rigidity of the track shoe and the adhesion of the track to the ground. The water well drilling rig site also has supporting chain wheels, supporting wheels, driving wheels, and rail links. Two. Cleaning of water well rig tracks When cleaning the drilling rig, the sludge on the lower walking body should be cleaned at the same time. After the operation, whether the operator cleans the sludge on the lower walking body while cleaning the cab if there is sludge attached to the lower walking body. It is impossible to check the related parts. Therefore, please ...