Precautions for Water Well Drilling Rig Maintenance

图片
After the  water well drilling rig   leaves the factory, it usually has a running-in period of about 60 hours (sometimes called the running-in period), which is specified according to the technical characteristics of the initial use of the water well drilling rig. However, due to lack of common sense and tight schedules, some users have ignored the special technical requirements of the new rig during the run-in period, or hope to obtain benefits as soon as possible.  Water well drill rig  is overloaded for a long time during the running-in period, which causes frequent and early failures of the machine, which not only affects the normal use of the machine and shortens the service life of the machine, but also affects the progress of the project due to machine damage. Therefore, attention should be paid to the use and maintenance of water well rigs during the running-in period. Water Well Drilling Rig The characteristics of the running-in period are as follows: 1. Due to the in

How Is the Well Rig Maintained?

图片
1. The track of   water well drilling rig   is composed of track plate and track pin.The crawler pin is connected to the crawler plate to form a crawler connection. There are holes at both ends of the track plate, meshing with the driving wheel, and guide teeth in the middle to straighten the track. The well drill prevents the track from falling off when turning. On the side in contact with the ground, there is a reinforced anti-skid rib (referred to as pattern) to improve the robustness of the track plate and the adhesion between the track and the ground. Well drilling RIGS also have supporting wheels, supporting wheels, driving wheels and rail connections. When cleaning the  water well drill rig , the sludge on the lower walking body should be cleaned at the same time. After the completion of the operation, if there is sludge on the lower walking body, whether the driver also cleans the sludge on the lower walking body when cleaning the cab.Its associated parts cannot be inspected

Maintenance Knowledge of Small Dth Drilling Rig

图片
I. Installation of  DTH drill rig : 1. The size of the rock drilling space preparation space can be determined according to the type and method of drilling. 2. Bring gas water near the point of use (if water and dust removal is needed), pipes, lighting circuits, etc. 3. Hole position According to the design requirements, we guarantee the stable positioning of the rig. Second, check before operation: 1. When starting work, please carefully check whether the gas and water (if water and dust removal) pipes are tightly connected, especially if the Fengshui pipe joint and the Fengshui pipe are tightly connected to prevent tripping. You should check for injuries and not allow all joints to leak . 2. Make sure the oil mist is full of organic oil (not too much). 3. Check whether the screws, nuts, joints, etc. of each part of the small-scale down-hole drilling rig for photovoltaic piles are tightened, and that the positions are firm and firm. 3. Drilling work procedures and rod